Table of Contents¶
Table of Contents Lode Data Corporation from the original PDF maual.
- Chapter 1: Introduction to the Design Assistant
- Welcome to the Lode Data Design Assistant
- About This Manual and the Design Assistant
- Covering Some Background Information
- How to Use This Manual
- What the Design Assistant Can Do For You
- Chapter 2: Software Installation
- What You Should Have From Lode Data Corporation
- Computer Hardware Required to Run the Design Assistant
- Installing the Key ("Dongle")
- Installation
- Design Assistant
- Sample Files
- Command Line Switches
- Chapter 3: Let’s Get Started
- Starting the Program
- Working With the Menus
- What are the Project Settings?
- Setting up the Project Settings
- Using the Keyboard
- Using the Mouse
- What is a Network?
- More About Nodes
- What is a Branch?
- How Much Can the Program Handle?
- Getting Help When You Need It
- File Naming Conventions
- How to Exit the Program
- Chapter 4: Pull-down Menus and Toolbars
- Pull-down Menus
- File
- Edit
- Mode
- Tools
- Global Change
- SpecEdit
- Test
- Misc
- Reports
- View
- Help
- Toolbars
- Chapter 5: Utilities
- Utilities
- Jump
- Amplifier Definition Window
- MDU Definition Window
- Network Initialization Window
- Global Change Menu
- Cables
- Maps
- Levels
- Map Grid
- Creating a Custom Map Grid
- Chapter 6: Entry Menu
- Entry Menu
- Active Entry Menu
- Chapter 7: Design Menu
- Design Menu
- Reading the Design Screen
- General Cursor Movement
- Design Commands
- Pad/EQ Selection
- Test Errors
- Chapter 8: Reports
- Print Pull-down Menu
- Specs
- Networks
- BOM
- Misc
- Creating a Control File
- Chapter 9: Powering
- Powering Screen
- General Cursor Movement
- Placing Power Supplies
- Placing Power Stops
- Powering Commands:
- Centralized and Distributed Powering
- Network Interface Unit Powering Analysis
- Test Errors
- Chapter 10: Building Specification Files
- What Are Specification Files?
- Getting Around in Spec Files
- Parameters
- Create Parameters File: General Parameters Tab
- Create Parameters File: System Levels
- Create Parameters File: Tap Selection
- Create Parameters File: Powering
- Create Parameters File: Underground Housings
- Create Parameters File: Frequencies
- Actives
- Create Active File: Actives
- Setting Up Active Inputs
- Create Actives File: Reserve Gain
- Create Actives File: Powering Data
- Equalization
- Pre-stage Equalization
- Mid-stage Equalization
- Create Actives File: Pads & EQs (Bank 1-Bank 4)
- Create Actives File: EQs (Bank 5 – Bank 8)
- Create Actives File: Plug-Ins
- Create Active File: Plug-In Powering Data
- Create Actives File: Configuration Table
- Create Actives File: Bridgers\Feedermakers\Inline Eqs
- Create Actives File: Feedermakers
- Create Actives File: Equalizers
- Create Actives File: Cascade Setup
- Taps
- Create Taps File: Tap ID and Part Numbers
- Create Taps File: Two Ports, Four Ports, Six Ports, and Eight Ports
- Create Taps File: Active Taps
- Create Tap File: Tap Swap Options
- Create Taps File: Pads\Eqs
- Couplers
- Create Couplers File: Couplers
- Defining Amplifier/Optical Receiver Couplers
- Create Couplers File: Base NIUs
- Create Couplers File: NIU Power Requirements
- Create Couplers File: NIU Arrays
- Create Couplers File: Meta NIUs
- Cables
- Create Cables File: Cables
- Create Cables File: Connectors
- Create Cables File: Series/Color
- Pricing File - Create Pricing File: General Pricing - Create Pricing File: Cable Costs
- Performance File
- Create Performance File
- Xspec File
- Chapter 11: Macros
- What is a Macro?
- How to Setup a Macro
- Creating and Editing Text Macros
- A Few Macro Ideas
- Batch Macros
- Chapter 12: Tutorial
- Tutorial: Plant Extension
- Step #1: Project Settings
- Step #2: Starting a New Network
- Step #3: Entering Strand Data
- Step #4: Reading the Design Screen
- Step #5: Designing the Plant Extension
- Step #5 – 1 Design Menu
- Step #5 – 2 Using Will Work
- Step #5 – 3 Placing an Amp
- Step #5 – 4 Placing a Coupler
- Step #5 – 5 Changing a Coupler Value
- Step #5 – 6 Moving an Amp
- Step #5 – 7 Creating a Backfeed
- Step #5 – 8 Testing the Network
- Step #5 – 9 Naming Amplifiers
- Miscellaneous A
- Ped Counting
- Guidelines For Point Assignment
- When Peds Are Counted
- Troubleshooting B
- Troubleshooting
- Security key problems
- General Design Assistant Questions
- Utilities
- Readkey.exe
- Install_1_wire_drivers_x86_v403beta.msi
- Installation file for the USB drivers
- GLOSSARY
- Glossary of Terms
- INDEX